Energy & compute infrastructure · Emerging markets

Compute where the power is.

Anvil builds solar-powered data centers in the emerging markets the industry has written off: grids with power to spare, land to build on, and governments that want the load, with permits measured in months.

StatusSite selection · 2026
PowerSolar + storage, grid as backup
Form factorModular, 5–20 MW blocks
Scroll

01 · The constraint

The world has power
it can't use. And demand
it can't meet.

Demand, where the industry is

AI wants more power than the grid can give. Data centers will use about 945 TWh a year by 2030, more than double today. In the US, over 2,000 GW is stuck waiting to connect, and that wait runs past five years.

Supply, where the industry isn't

Emerging markets have the opposite problem. Utilities pay for power nobody uses. In 2025, one government offered 2,000 MW of it to data centers in a single announcement.

0TWh
Global data center electricity demand by 2030, more than double today.
IEA · Energy and AI, 2025
0GW
Generation and storage waiting in US interconnection queues.
Berkeley Lab · Queued Up, end 2025
0+ yrs
Typical US path from interconnection request to commercial operation.
Berkeley Lab · Queued Up, end 2025
0MW
Surplus power one emerging-market government allocated to data centers in a single 2025 announcement.
Government of Pakistan · May 2025

Anvil brings the compute to the power. Solar on site. Storage on site. Racks on site. No queue.

02 · The playbook

Four moves. Every market.

Each Anvil site follows the same sequence, so the second site is faster than the first and the twentieth is a template.

Surplus Grid Solar · 40 MW Storage · 120 MWh Compute · 5–20 MW Fiber · Landing station Town
Step 01 / 04Find stranded power
01

Find stranded power

We map markets where generation outruns demand and storage: curtailed solar, under-used hydro, idle thermal plants, and grids that pay for electricity nobody draws. Then we go where the surplus is largest and the welcome is warmest.

Inputs · Grid data, curtailment records, land near substations
02

Build generation and storage on site

Anvil develops its own solar and battery capacity beside each site, so every hall runs on firm, low-cost renewable power with the grid as backup. The host utility sells surplus it could never sell before. We buy it at a price nobody in Virginia will ever see.

Kit · Single-axis solar, 4-hour storage, 33 kV interconnect
03

Drop in modular compute

Prefabricated data halls arrive by truck and ship in 5 to 20 MW blocks. The first racks are live within months. Capacity grows by adding blocks beside the last one, with no second round of civil works.

Kit · Liquid-cooled halls, factory-built, 12-week lead time
04

Connect the country

Fiber to the nearest landing station, a local workforce trained on site, and reserved capacity for the host nation's own universities, agencies and startups. The town becomes a compute location. The country becomes a market.

Outputs · Export compute, sovereign capacity, local jobs

03 · The scale

Measured in gigawatts.

These are the targets we hold ourselves to. They are ambitious on purpose: the opportunity is the size of every grid that has more power than customers.

0GW
Compute under management by 2030Across sites of 20 to 100 MW each, every one powered by solar and storage built for it.
0
Sites across three continentsEach one assembled from the same kit, on the same timeline, under the same operating playbook.
<0¢/kWh
Delivered power costSolar plus storage, on land where sunlight is the cheapest input there is.
0mo
Site agreement to first racks livePrefabricated halls, pre-negotiated power, and permitting we have run before.
2026
Site selection and power agreements in the first three markets.
Now
2027
First site energized. First 20 MW of racks live.
Next
2028
Five sites across two continents. Sovereign compute programs with host governments.
Then
2030
1 GW under management. The Anvil kit licensed to partner developers.
Target

Where others won't.

Every town with a surplus is a compute location. Every country is a market. The map of the world's compute is mostly blank, and we intend to fill it in.

Built in the places the industry skips
Powered by the sun that falls there
Owned, in part, by the countries that host it

04 · Partner

Bring Anvil to your grid.

We work with governments, utilities, independent power producers, landowners and investors. If you have surplus power, land near a substation, or capital for infrastructure that lasts decades, we want to hear from you.

Governments & utilities

Sell the surplus

Turn idle capacity into export revenue, sovereign compute and local jobs, on a timeline measured in months.

Energy developers & landowners

Build with an anchor

Co-develop solar, storage and sites with a long-term tenant who signs before the first panel goes in.

Investors

Own the hard assets

Back land, generation and halls that serve the fastest-growing load on earth, in markets with the least competition for it.

or write to abe@anvildata.si